IH 35 Project-Waco District
IH 35 Corridor Project Description | IH 35 Corridor Publications
FAQs | Site Map | IH 35 Corridor Home | Section 2: Belton/Temple Home


Feedback
Publications
Project Description
Public Meetings
Study Area Maps

Belton/Temple: Public Meetings:
August 28 and 30, 2001 Public Meetings

PUBLIC MEETINGS

IH 35 through Belton and Temple, Bell County

The Texas Department of Transportation (TxDOT) conducted two public meetings to discuss the proposed widening of Interstate 35 from LP 121 in Belton to North LP 363 in Temple. The first meeting was held on Tuesday, August 28, 2001 at the Belton Intermediate School Cafeteria. The second meeting was held on Thursday, August 30, 2001 at the Leopard Room of the Temple College Student Union Building. Each meeting began at 7:00 p.m.

The following slide show presentation was given at the meetings.


Last updated October 2, 2001.
Visit the HDR web site

Sponsored by:
Visit the TxDOT Waco District Web Site